• Landfill permitting including CEQA
• compliance, permit applications,
• Joint Technical Documents,
• financial
mechanisms, use permit
• revisions
• Closure cap design and testing,
• using thickened native soil clay,
• Geosynthetic Clay Liners (GCL),
• High Density Poly Ethylene (HDPE),
• and low-permeability asphalt
• Base-liner design, inspection, and
• testing using clay, GCL, and HDPE
•
Groundwater and vadose
• monitoring and corrective action
•
Perimeter, infill, and ambient-air
• landfill gas monitoring
•
Infill and perimeter gas-extraction
• system design
•
Surface water monitoring, Storm
• Water Pollution Prevention Plans,
• and drainage design
•
Clean closure
•
Hazardous material facilities
• permitting, design, construction,
• and operation
•
Transfer station permitting, design,
• and operation
|
|


 |