STORM-WATER MANAGEMENT

Lawrence & Associates' civil engineers and hydrologists assist our clients with a wide variety of storm water related issues:

Flood and Peak Flow Modeling

  • Flood plain analyses using HEC-1 or WMS and HEC-RAS modeling is used to establish flood plain in unmapped areas and evaluate effects of construction within the flood plain
  • WMS or FLOW (City of Redding) to calculate peak flow and storm-water detention requirements for larger subdivisions
  • Rational and similar methods to calculate peak flow and detention for smaller sites

Regulatory Compliance

  • Storm Water Pollution Prevention and Erosion Control plans for construction
  • Storm Water Pollution Prevention Plans for site operation
  • Statewide industrial storm-water discharge permitting
  • Reports of Waste Discharge (ROWD)
  • Individual National Pollution Discharge Elimination System (NPDES)
  • Best Practicable Treatment and Control (BPTC) plans
  • Storm Water sampling and reporting
  • Spill Prevention Control and Countermeasure Plans (SPCCs).
  • State dredge and fill permits, technical reports, and applications.
  • Army Corps of Engineer's 401/402 dredge and fill permits
  • California Department of Fish & Game stream-bed alteration permits

Design

  • Parking, grading, and drainage
  • Onsite storm water detention or retention
  • Spill containment
  • Storm water treatment facilities
  • Porous pavement design
©2006 Lawrence & Associates •  Site by Abra